Quality Control
We are avid Quality Control advocates. My
experience (Randy Williams) from importing products from China, and as a
consumer buying items from China has substantiated the need for strong
Quality Control measures. As we bring in parts or products I look at
them as if they were going to be mine. What would I expect from a QC
perspective? Combine that with the requests from you "our customer" and
we can assure you every possible step will be taken in the production
of your products. Following is a guideline we use with new factories,
and for customers ordering a full QC report on a specific production
run.
Sample Factory Audit:
1. Factory audit. Before the production starts, we would conduct a
Factory audit which will include the following:
a) Organization
b) Procurement
c) Manufacturing
d) Statistical Quality Control
e) Factory QA/QC
f) Safety and P.R.A.T. (Product Reliability Assurance Test )
Procedure
g) Facility
h) Others ( continuous improvement and customer satisfactory)
There will be a very detailed report on above issues and the problem
found, the top management of the factory should provide us a
countermeasure and corrective actions on above within 10 days.
2. Pre-inspection. This will be conducted at the pilot run stage
and covering the following issues:
a) Check the production units per the Manufacturer's Inspection
procedure and judgment criteria
b) Check the production units per customer's sample
c) Check the production line set up
d) Check the P.R.A.T. status on this product
e) Conduct the Safety test, Vibration test, Master carton and
individual drop test
f) Storage and Operate temperature test Also there is a detailed
report on above issues and the problem found, the factory should provide
us a countermeasure and corrective actions on above within5 working
days.
3. Final outgoing inspection.
The mass production should starts
only after all the above mentioned problems have been properly solved,
and we will conduct the final outgoing inspection only when the products
the factory QA audit. The following aspects will be covered during the
outgoing inspection:
a) Package condition check
b) Comparing customer's sample
c) Function check
d) Internal check
e) Reliability test
f ) Full data measurement
g) The inspection will be conducted per MIL-STD-105E, LEVEL-II,
Single sampling plan, Normal. Critical-- AQL: 0; Major--AQL: 0.65;
Minor--AQL: 1.5.
For each of the above items we have a very detailed check list,
e.g., Function check.
a) Perform the function per the Owner's Manual.
b) Cosmetic check: dirty, scratches, labels, migrations (AC cord,
rubber foot), paintings, screen printing, discoloration of the cabinets,
cracks, stress marks, shrink marks, sharp edges (points), etc.
c) Assemble check: mounting screws, rubber foot, bracket mounting,
etc.
d) Fitness check: adapter, plug, accessories, gap between
cabinets, latch, socket, connector.
e) Safety: AC cord, length, plug shape, warning, UL, etc.
f ) Strength: plastic molded plug end, pull test of wire and
cable.
g) Mechanical strength of moving part: antenna must stand at any
angle.
h) Metal parts: rust, corrosion, sharp point or spur,
deformation, etc.
A Final Inspection Report will be issued out with the judgment
of "passed" or "Rejected" and the problems found.
If this kind or reporting is of interest to you, please contact us
for information.